Karuah - NSW

Turnkey electrical package

New build- crushing and screening plant

Approx value: 2M 

  • The design, engineering, installation, testing, commissioning of a new 4000A Main Distribution Centre/Motor Control Centre complete with Power Factor Correction equipment
  • Supply and installation of Earth Leakage protection equipment
  • Supply and installation of Pre-Fabricated switchroom
  • Carry out field installation of all new equipment including crushers, screens and conveyors

Turnkey electrical package

Significant upgrade- crushing and screening plant

Approx value: 2M 

  • The design, engineering, installation, testing, commissioning of a new 1600A Main Distribution Centre/Motor Control Centre complete with Power Factor Correction equipment
  • Supply and installation of Earth Leakage protection equipment
  • Supply and installation of two Pre-Fabricated switchrooms
  • Carry out field installation of all new equipment including crushers, screens and conveyors
  • Carry out alterations and additions to the existing electrical installation

Cedar Creek - QLD

Orange - NSW

Turnkey electrical package

New build crushing and screening plant

Approx value: 1.5M 

  • The design, engineering, installation, testing, commissioning of a new 2500A Main Distribution Centre/Motor Control Centre complete with Power Factor Correction equipment
  • Supply and installation of Earth Leakage protection equipment
  • Supply and installation of Pre-Fabricated switchroom
  • Carry out field installation of all new equipment including crushers, screens and conveyors

Turnkey electrical package

Significant upgrade- crushing and screening plant

Approx value: 1M 

  • The design, engineering, installation, testing, commissioning of a new 3200A Main Distribution Centre/Motor Control Centre complete with Power Factor Correction equipment
  • Supply and installation of Earth Leakage protection equipment
  • Supply and installation of Pre-Fabricated switchroom complete with fire detection equipment
  • Carry out alterations and additions to the existing electrical installation
  • Supply and installation of the electrical works associated with the upgrade to the plant equipment and machinery
  • Hitech won the 2017 Master Electricians Australia National Excellence Award for an industrial/mining project for this particular project
  • The QLD Mines Department inspector commented that work that was completed on this project is considered to be amongst the best seen in the mining and quarrying industry

Glass House Mountains - QLD

Hobart – TAS

Turnkey electrical package

Significant upgrade- crushing and screening plant

Approx value: 1M 

  • The design, installation, testing, commissioning of 1200A Main Distribution Centre/Motor Control Centre complete with Power Factor Correction equipment and remote operation of all circuit protection devices rated at or above 800A
  • Supply and installation of Earth Leakage protection equipment
  • Supply of Pre-Fabricated Switchrooms complete with fire suppression equipment
  • Installation of earth grid system
  • Installation of all electrical equipment and wiring and the associated control and safety systems for the crushing plant
  • Supply and installation of three YASKAWA U1000 Matrix Drives on three downhill conveyors utilising the regenerative capabilities of the drives to return the regenerative power to the power grid. Hanson won an environmental innovation award for this project.